Structural Engineers & Architectural Services

Email US
info@parseng.com

TEL: 0207 243 6000

FAX: 0207 243 8000

Address:
Office Suite (1- 4)
72-74 Notting Hill Gate, LONDON, W11 3HT

We are above Notting Hill Gate Station. Above Book Ware House.

Party Wall Surveyor
Loft
Extension
Load Bearing wall
Flood risk assessment

Basement calculation
Project Management
Architectural Services London

THE PARTY WALL etc. ACT 1996: Click here to download the PDF file. File size=597kb
If you are building within 3m of the boundary line or if the proposed work affect a party wall, e.g. beam to bear onto the party wall, the owners or leaseholders of the adjoining properties must be informed.

Structure
A1: Loading
A2: Ground Movement
A3 Disproportionate Collapse

Site preparation and resistance to moisture
C1: Preparation of Site.
C2: Dangerous and offensive Substances
C3: Subsoil drainage
C4: Resistance to weather and ground moisture

Toxic substances
D1: Toxic Substances

Ventilation
F1: Means of Ventilation
F2: Condensation in roofs

Water and wastewater
H1: Foul Water Drainage
H2: Wastewater Treatment Systems and Cesspools
H3: Rainwater Draingage
H5: Separate System of Drainage
H6: Solid Waste Storage

Protection from falling, collision and impact
K1: Stairs, Laders and Ramps
K2: Protection from falling
K3: Vehicle Barriers and Loading Bays
K4: Protection from collision with open windows, skylights and ventilators
K5: Protection agaist impact from and trapping by doors

Access to and use of buildings
M1: Access and use
M2: Access to extensions to buildings other than dwellings
M3: Sanitary conveniences in extensions to buildings other than dwellings
M4: Sanitary conveniences in dwellings

Glazing - Safety in relation to impact, opening and cleaning
N1 Protection agaist impact
N2: Manifestation of glazing
N3: Safe opening and closing of windows, skylights and ventilators
N4: Safe access for cleaning windows etc.

All Approved Documents From Planning Portal